Additional Links

Mexico Road Resurfacing Project Begins July 5

June 28, 2017

A major resurfacing project on Mexico Road between West Sunny Hill Boulevard and Mid Rivers Mall Drive is scheduled to begin Wednesday, July 5, 2017, and last through the summer. Although the road will remain open to both eastbound and westbound traffic at all times, this project will include daily lane closures and at times could limit traffic on Mexico Road to one lane in each direction.

 

The Mexico Road Resurfacing Phase II project will include replacement of the existing asphalt pavement surface, removal and replacement of defective concrete pavement, and concrete diamond grinding to improve pavement smoothness. Sidewalks also will be repaired where necessary and improved to meet current ADA standards, and traffic signals will be upgraded.

 

Drivers are asked to use caution when traveling through work zones.

 

For the latest news about City of St. Peters street projects, go online to www.stpetersmo.net/streets.